2024 April Newsletter

HVDC Cable Modeling in EMTP®

As technology advances, new challenges arise for power systems engineers in terms of EMT modeling and simulation. A good example is the HVDC transmission system under construction between France and Ireland. The French and Irish transmission system operators (RTE and EirGrid) have been working together to build this 575km length, 700MW HVDC link to connect the two countries.

X